Value of Contract 1,810,000 K.D |
Date of Enterprise 01/11/1997 |
Date of Handing over 01/02/1999 |
Scope of Work
This contract covers the construction, completion and maintenance of the following works: –
– R.C. Ground Reservoirs for F.W. (Capacity 15 Mill Imp. Gallons) at Mutla including all internal and external piping and all required connections to the existing pipelines and asphaltic roads.
– The Contractor has to design, supply install and commission new control equipments for the extension of the existing DCS system, with all field instruments for level, flow. Measurement and electrical actuators for valve operation, etc., for the new reservoir at Mutla Low site.
– The new Mosaic Mimic shall be provided with control push buttons and display all the signals of existing reservoirs at Mutla Low site, in addition to the new reservoir signal such as level indication, flow indication, push buttons for remote control of inlet and outlet valves with valve position indication and status etc.
Major Items
Str. Excavation Plain, ConcrReinf Concr, .D.I. Pipes 150-1200 mm Dia. & Fittings, Road work, Reinf. Concrete pipes 300-1200 mm Dia