Coastguard Headquarters and Facilities

Value of Contract  33,390,000  K.D

Date of Enterprise 01/10/1998

Date of Handing over 22/06/2002

Scope of Work

 

The Project is construction, completion and maintenance of Works and training the Employer’s personnel in maintenance and operation

The project consists of off shore works (Breakwaters, Berths, Vessel maintenance and repair facilities, etc) and on-shore works (administrative buildings, workshops, stores, and services blocks, indoor gymnasium. Swimming pool, etc) The works also include complete installation of engineering services, roads, parking areas, paving, landscaping, fencing with observation towers, external services and security system.

The existing site area is 40000 m2 with developed harbor area of 200000 m2.  and total on-shore area after reclamation of 150000 m2 the following is buildings and facilities, which will form part of the project: –

All building construction includes internal partitions and external walls, finishing doors windows, fittings and electrical and mechanical services

Marine Works: –

Main Breakwater and Lee Breakwater Approx. total length

Rock materials (0.5 Kg-6 ton)

Dredging

Reclamation & Sand fill

Jetties, Quays and Pontoons approx. total area                                                         Maintenance Facilitation Slipways

Environmental Services: –

Irrigation Water Tank

Ground Water Reservoir

Elevated Water Tank

Site Security & Fencing: –

Boundary Walls

Chain Link Fencing

Watch Tower

External Lighting System

Roads, Paving & Landscape: –

Roads & Paving

Conc. Paving

Landscaping (Hard and Soft)  (Trees, Palms Pots shrubs) Sports Field Gymnasium include (swimming pool, Basket Ball, Hand Ball, Volley Ball ) and foot Ball playground

Fuel: –

Fuel Storage and Supply Network Black Steed Pipes 2-6dn 2245 L.m.&  Galv. St. Pipes 2-4dn 1920 L.m