Reinforced Concrete Ground Reservoirs at West Funaitees


 

Value of Contract  14,500,000  K.D

Date of Enterprise  15/02/1994

Date of Handing over  15/08/1996

Scope of Work

 

The work shall covers the construction, completion (including any necessary repairs) and maintenance of the following civil, mechanical, electrical, instrumentation, control and telemetry work at WEST FUNAITEES AREA SITE (about 25 Km. From Kuwait City): –

– Five Fresh Water Reinforced Concrete Ground Reservoirs, four having a storage capacity of 44 (Forty-four) Million Gallons each and the fifth having a storage capacity of 40 Million Gallons.

– One Brackish Water Reinforced Concrete Ground Reservoir having a storage capacity of 45 Million Gallons, all internal and external piping and all required connection to the existing pipelines, Control Building, Gate Balding, R.C. Boundary walls with barbed wire and all ancillary works

Major Items

Str. Excavation, Plain Concrete, Reinf Concrete, D.I. Pipes 150-1200 mm  Dia. & Fittings, Irrigation U.P.V.C Pipes 100mm Dia., Road work, Flush water U.P.V.C  Pipes160 mm Dia., Drainage G.R.P Pipes 400-1200 mm Dia.

Back