Water Pipelines from north Shuaibah to new Mina Abdullah


 

Value of Contract  15,800,000.000 K.D

Date of Enterprise 13/11/2009

Date of Handing over  12/02/2011

Scope of Work

 

This Contract comprises of the Installation, Construction and Maintenance of  1200 mm dia three distillated  water pipelines from north Shuaibah  distillation  water plant to the new Mina Abdullah distribution water complex and connect with exist. 1000 ,800 ,500 mm pipeline , supply the static mixer ,magnetic flow meter

Also forming part of the works is the connections of the new distilled water pipe lines with two proposed main headers construction by others at shuaibah distillation plant and new mina Abdullah distribution water complex.

Also included are a land survey and site investigations of the route of each pipeline; the provision of design Engineers to adjust the Project drawings as necessary in accordance with the information gathered; and the production of construction drawings including all details for connections.